CITY OF FORT OGLETHORPE BUILDING CODE SUMMARY FOR ALL ...
Fort Oglethorpe Administration and Enforcement Page 12 1 CITY OF FORT OGLETHORPE BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS ... Return Document
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS ...
NC Administration and Enforcement 29 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT1 AND 2-FAMILY DW ELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) ... Visit Document
Building Code Summary
FOR ALL COMMERCIAL PROJECTS. NC 2012 BUILDING CODE Allowable Area and Height Calculations. THIS SECTION FOR NEW, ADDITION, CHANGE OF USE, AND INTERIOR COMPLETIONS Exterior Wall. Heat output of unit _____ Cooling output of ... Retrieve Full Source
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS Seismic (IE) _____ Live Loads: Roof _____ psf Floor _____ psf Snow Load: _____ psf motor horsepower number of phases minimum efficiency motor type # of poles MECHANICAL SUMMARY ... Retrieve Content
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL FIRE ...
FOR ALL COMMERCIAL FIRE RESTORATION PROJECTS (EXCEPT . 1. AND . 2- Emergency Lighting: No Yes Exit Signs: No Yes Fire Alarm: No Yes Smoke Detection Systems heat output of unit . cooling output of unit . Boiler . total boiler output. ... Return Document
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS ...
NC Administration and Enforcement 29 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) ... Document Viewer
City Of Redding PLAN CHECK SUBMITTAL 777 Cypress Avenue ...
• Seismic Zone 3 • Basic wind speed (75 mph) • Snow load (30 psf, ‘ Two sets of structural calculations, actual loads (totaled), with fixture and equipment schedules (new and existing loads) ... Fetch Document
2006 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL ...
FOR ALL COMMERCIAL PROJECTS Seismic (IE) _____ Live Loads: Roof _____ psf motor horsepower number of phases minimum efficiency motor type # of poles MECHANICAL SUMMARY MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT ... Document Viewer
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS ...
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) ... Return Doc
1 Technical Requirements
Heat Recovery Steam Generator 29. 6.2.1. HRSG Casing 34. 6.2.2. Seismic design loads shall be in accordance with the requirements set forth in the California Building and or local governing Pipe wall thickness calculations shall be based on the lowest strength component in the ... Doc Viewer
DeCAH 20-1 DeCA DESIGN CRITERIA HANDBOOK 16000 ELECTRICAL ...
Small motors, equipment loads and lighting not suitable for 277v: connect to 120/208V, 3-phase system. 4. One Line Electrical Diagram: Include detailed One Line Electrical diagram in the project drawings calculations and cut sheets the basis of delete seismic bracing, testing, ... View Full Source
1 Technical Requirements
Heat Exchangers 44. 6.11. Pressure Vessels 45. 6.12. Fuel Gas Supply Seismic design loads shall be in accordance with the requirements set forth in the California Building and or local governing Pipe wall thickness calculations shall be based on the lowest strength component in the ... Content Retrieval
C O M P A N Y P R O F I L E
Heat and Mass Transfer Calculations o Occasional: Hydro Test / Safety Valve’s Reaction Force / Seismic / Wind Loads Selection of HV/LV Switchgear, Motor Control Centers. ... Retrieve Document
Appendix 10
Seismic loads will be determined in accordance with the Components will be formed from galvanized steel, factory primed, and field painted. Doors will be motor-operated with override Manual calculations and simple computer models based on the fundamental principles of dynamic ... View Full Source
2006 IBC BUILDING CODE CHECKLIST
FOR COMMERCIAL PROJECTS Seismic (Ie) Live Loads: Roof psf Mezzanine psf Floor psf Snow Load: psf heat output of unit cooling output of unit Boiler total boiler output. If oversized, state reason. Chiller ... Get Content Here
APPENDIX B - NCDOI
Separated Use (302.3.2) - See below for area calculations. Seismic (IE) _____ Live Loads: Roof _____ psf. Mezzanine _____ psf. motor horsepower. number of phases. minimum efficiency. motor type # of poles. mechanical summary. ... Fetch Doc
ELECTRICAL REQUIREMENTS FOR HEALTH CARE FACILITIES
Load calculations or other approved methods showing verification of load capacity for all Panel schedules with totalized, tabulated loads. Panel schedules shall indicate rating of panel, feeder conductor, feeder overcurrent protective device motor, and pump; separate transfer ... Get Document
City Of Redding PLAN CHECK SUBMITTAL 777 Cypress Avenue ...
• Seismic Design Category D ‘ Two sets of structural calculations, stamped and signed by licensed California architect or engineer actual loads (totaled), with fixture and equipment schedules (new and existing loads) ‘ Panel schedules: ... Read Document
No comments:
Post a Comment